View Single Post
Old 12-17-2010, 07:32 AM   #6
Flop
Senior Member
 
Join Date: Dec 2010
Location: pittsburgh pa
Posts: 576
Default Re: 1930 Ford Sheetmetal Work

Sponsored Links (Register now to hide all advertisements)
wheel well patch sittin in place



some primer on the subframe and some weld-through primer on the lower part of the patch because i dont know if the patch gets spot welded to the subframe once ya wrap it around or not.



tacked in .

i usually dont work with that many tacks but for this one it seemed impossible not to. there were alot of variations in where the patch panel wanted to sit and where the og wheel well was so a ton of tacks it was





finished up!



for future reference it took a little more then 18 feet of tig rod to weld in the patch haha



another view

__________________
Please call or email while website is down!
412 867 1659
[email protected]


https://www.facebook.com/flop.custom

Last edited by Flop; 09-07-2011 at 07:31 AM.
Flop is offline   Reply With Quote