Re: 10 jokes only engineers will understand
As a truck mechanic in the parcel delivery sector, we had to repair plant equipment on night shift.A new conveyor system was designed by an out of state engineer and installed by a contractor. System broke down after 20 min. I had to work three hours to repair it. The engineer called to ask how the system was running. I just had to ask him what railroad he worked for CSX or Seaboard Coastline.
|