View Single Post
Old 02-11-2012, 04:59 PM   #81
yachtsmanbill
Senior Member
 
yachtsmanbill's Avatar
 
Join Date: Dec 2011
Location: Two Rivers, Wi.
Posts: 1,406
Default Re: Jetzt, da der Staub gelegt hat, seine Zeit bei der Arbeit

I must really have some horrid breath to scare everyone away Either that or its my typing fingers from, ah, er, handcleaner, or, worse

Got that U joint pin put in this morning. Had to grind the length so it wouldnt rub with enuff to pein over. Did one end in the vise, then some locktite, installed and ran her home. Center drilled the second side 1/16 so I could get a punch in the hole to spread it a bit. Had a drift pin from the floor up, to pein the final. Worked like a champ!
Moved about 10 big tubs full of stuff to get this guy outside and turned around. Pretty stiff with new brakes and being so cold. ws







This crazy project is taking up an entire 24X38 foot shop!